The car is almost not moving.
In Orekhovo-Zuevskaya district of Moscow region on the Federal highway M-7 “Volga” was formed tube length of at least 20 km.
Traffic was the major overhaul of the track, which is on the border of Moscow and Vladimir regions.
Length of the reconstructed section of the route is 4 km. Traffic on the repaired area is carried out on the two lanes out of four.
© 2017 – 2019, paradox. All rights reserved.