“In the Berezansky area put into operation the second turn Tuzlovsky VES, LLC “Wind Park “black sea”, which is located within the Tuzlovsky village Council.
The wind farm “black sea” started its work in October 2016. Today the total capacity of wind turbines of the Park is 5 MW. In General, however, its planned capacity is designed to produce 30 MW of electricity”, – stated in the message.
It also notes that the introduction of a new wind power plant Park (wind turbines 001) 3.2 MW is by far the most powerful in Ukraine.
© 2017 – 2019, paradox. All rights reserved.
State troopers used pepper spray and stun grenades as they arrested dozens of pro-Palestine protesters…
The number and frequency of Ukrainian soldiers receiving training in US bases in Western Europe has dropped…
EU foreign policy chief Josep Borrell has insisted that member states don’t want their citizens…
Resistance to the continued military draft in Ukraine has taken some extreme forms, a soldier…
The Russian military has carried out several strikes that destroyed Ukrainian warehouses storing attack drones,…
France must open a debate on building up a pan-European defense capability, to include rethinking…