Categories: Society

In Kiev will restrict movement in the South bridge

The movement will be partially unavailable due to carrying out road works.

Thursday, 21 September (from 9.00 to 18.00), partially block the passage of transport on the overpass entrance on South bridge (in the direction of Bazhan Avenue). About it reports “kievavtodor” and asks to be sensitive to temporary difficulties associated with the repair of the road surface (this work will be completed under favorable weather conditions).

On 21 September there will be changes in work of trolley buses № 5, 8, 9, 17, which are from 9.00 to 20.00 roughly and will run differently. This is due to paving of the street Lva Tolstogo (Velyka Vasylkivska to the street of Vladimir). “Kievpasstrans” placed a temporary trolleybus scheme on its website.

Public transport is organized in such a way:

– the trolley bus № 5 “Street belitskaya — street D. Shcherbakivsky — Victory prospect Povitroflotskyi overpass”;
– No. 8: “smilyanskaya Street — prospect Avenue — b-R T. Shevchenko street Leontovicha street B. Khmelnitsky street Pirogov — b-R Shevchenko, and then the current track”;
No. 9: “Airport “Kyiv” — Povitroflotskyi Avenue — b-R T. Shevchenko street Leontovicha street B. Khmelnitsky street Pirogov — b-R Shevchenko, and then his scheme;
– No. 17: “Square of Cosmonauts — Povitroflotskyi Avenue — b-R T. Shevchenko street Leontovicha street B. Khmelnitsky street Pirogov — b-R Shevchenko, further — on the usual lines.

Meanwhile, in Kiev, completed major repairs of tram ways in the street Dmitrievsky, as reported by the “Kyivpastrans” on his page in Facebook. It noted that during the repair on the street Dmitrievsky used in modern technology noiseless tram tracks. Night work is still underway, but the movement of trams of routes № 15 and № 18 has resumed.

Gradually, in the capital increases the number of repaired roads. In the framework of maintenance “Kyivautodor” has performed works on Church street, Boulevard Romain Rolland. Recently finished work on Naberezhno-Korchevatskaya street, Avenue of Science, on the streets Boychuk, Gordienko, Turov, Boulevard Koltsova and others. Continue to repair another fifty objects.
Recall that in the previous two years in Kiev repaired 876 house adjoining plots and interquarter drives.

On the final stage came the overhaul of the transport interchange at the Les Kurbas Avenue (intersection with the street gnat Yura), on Victory Avenue (near the metro station “Nivki”), at the Odessa overpass. Road builders have started to upgrade the highway embankment.

© 2017 – 2019, paradox. All rights reserved.

paradox

Share
Published by
paradox

Recent Posts

Fico shooter protested suspension of Ukraine military aid – Slovak interior minister

The man who critically injured Slovak Prime Minister Robert Fico on Wednesday was a fierce…

4 days ago

No place for military blocs in Asia-Pacific – Putin

The Asia-Pacific region should be free of military blocs because of their potential to undermine…

5 days ago

WATCH Putin lands in Beijing for talks with Xi

Russian President Vladimir Putin was welcomed with an honor guard after his plane touched down…

5 days ago

Western elites want to prosper at the expense of others – Putin

Russian President Vladimir Putin has set the stage for his state visit to China by…

6 days ago

Зеркало сайта Vavada

С каждым днем онлайн-казино становятся все более популярными среди азартных игроков. И это вполне логично:…

6 days ago

Putin officially confirms new defense minister

Russian President Vladimir Putin has officially appointed Andrey Belousov as the new minister of defense.Belousov,…

6 days ago