Activists spoke on the state Museum.
In the underground space of the future Museum at the Postal square there was flooding due to rain.
As reported on page “at the Museum of Post”, on the Museum grounds around the perimeter of the observed moisture walls, water fills the hollows of the design pop, a bored pile is unstable.
Activists of the Museum recalled that the drainage system is an integral component of a new integrated project, which should ensure the creation of a Museum on the site of the monument of archeology.
© 2019, paradox. All rights reserved.