Categories: business

In Kiev after repair has launched the funicular

The funicular was repaired within a month.

The Kiev funicular resumed operations after the annual maintenance work at 12.00 on August 16.

According to the Kyivpastrans, the specialists conducted routine maintenance and the overhaul of individual units. In particular, repaired equipment, cars, electronic, mechanical, electrical, pneumatic equipment actuators; conducted static and dynamic tests.

Specialists of the Gosgorpromnadzor checked the operation of the funicular and allowed operation for the next year.

Repair work lasted from July 17 to August 16.

Kiev funicular is open daily from 7:00 to 22:00. The bottom stop is near the metro station Pochtovaya square, upper – street three saints (St Michael’s monastery).

© 2017 – 2019, paradox. All rights reserved.

paradox

Share
Published by
paradox

Recent Posts

Russian defense chief inspects new anti-drone weaponry (VIDEO)

Russian Defense Minister Sergey Shoigu has met with top military officials to discuss the battlefield…

9 hours ago

Palestinians chase away German diplomat (VIDEOS)

The German ambassador to the Palestinian Authority has been hounded by an angry mob and…

18 hours ago

White House mulls Russian uranium ban – Bloomberg

The Biden administration is considering a ban on enriched uranium from Russia using the president’s…

1 day ago

Pro-Palestine protesters arrested at Texas university (VIDEOS)

State troopers used pepper spray and stun grenades as they arrested dozens of pro-Palestine protesters…

1 day ago

Ukraine running out of troops for US to train – WaPo

The number and frequency of Ukrainian soldiers receiving training in US bases in Western Europe has dropped…

2 days ago

Europeans won’t ‘go die for Donbass’ – Borrell

EU foreign policy chief Josep Borrell has insisted that member states don’t want their citizens…

2 days ago