Categories: Society

The memorial to Holodomor victims in Kiev will spend more than 600 million

The work will take 24 months.

Construction of “Memorial complex of memory of victims of Holodomor” in Kyiv will cost half a billion hryvnia.

“The main technical and economic indicators the total estimated cost of construction at current prices as 04.09.2017 is 639 million UAH. The construction duration is 24 months”, – reported in the Ministry of culture.

Now the second phase of the National Museum “memorial to victims of Holodomor” is at the stage of preliminary design. For the construction of the second phase in 2018 provides 200 million UAH. It is planned that the Museum will be located in the underground part of the Memorial sign “Candle of Memory”, where visitors will be able to get up the stairs.

Recall the construction of the Memorial complex was planned in two stages. In 2008 implemented only the first stage – the memorial and Museum is not so far.

© 2017 – 2019, paradox. All rights reserved.

paradox

Share
Published by
paradox

Recent Posts

Russia issues military ultimatum to UK

Moscow will retaliate against British targets in Ukraine or elsewhere if Kiev uses UK-provided missiles…

1 hour ago

Zelensky can’t ‘mobilize God’ – Russian church

Ukrainian President Vladimir Zelensky cannot enlist God in Kiev’s fight against Moscow, the Russian Orthodox…

10 hours ago

Ukrainians are God’s chosen people – Zelensky

Ukrainian President Vladimir Zelensky has proclaimed that God is an “ally” of Ukraine in the…

19 hours ago

Israel ready for temporary truce with Hamas – Netanyahu

Israel is willing to pause its military offensive in Gaza if Hamas releases all the…

1 day ago

Some EU states still consider Russia ‘good friend’ – Borrell

The EU’s top diplomat, Josep Borrell, has admitted that not every member state agrees to…

2 days ago

WATCH Russian forces destroy US-made armor

Russia’s Defense Ministry has published a video clip from the front line with Ukraine showing…

2 days ago