The residential complex was built near Alushta
In the Crimea and concrete monster has disfigured the landscape of the southern coast.
According to the Crimean people, the building erected in just 10 km from Alushta.
“Phone on the building on is not “Console”, elite residential complex – I counted more than 12 floors. How is that possible?” – asks local activist Alexander Talipov.
He noted that the firm “Console” belongs to the head of the so-called “state Council” Vladimir Konstantinov.
© 2017 – 2019, paradox. All rights reserved.