The power unit №3 South-Ukrainian NPP was disconnected from the power grid of Ukraine for middle outage.
The unit is turned off in 1.43 Sunday, April 2.
Scheduled repair time of the unit will be 103 days. List of major works that are scheduled to execute, is included, including the removal of spent nuclear fuel, test & measurement fuel assemblies Westinghouse.
The first and second power units of South-Ukrainian NPP work without remarks in the set mode.
“The radiation background at the industrial site it is southern-the Ukrainian NPP is at the level of natural background values which were measured before start of the nuclear station. As of April 2, he is 0.12 µsv/h. Emissions and discharges of radioactive substances into the environment does not exceed the established admissible values”, – noted in the company.
© 2017, paradox. All rights reserved.
Russian President Vladimir Putin has officially been sworn into office for a fifth term. In…
Moscow will retaliate against British targets in Ukraine or elsewhere if Kiev uses UK-provided missiles…
Ukrainian President Vladimir Zelensky cannot enlist God in Kiev’s fight against Moscow, the Russian Orthodox…
Ukrainian President Vladimir Zelensky has proclaimed that God is an “ally” of Ukraine in the…
Israel is willing to pause its military offensive in Gaza if Hamas releases all the…
The EU’s top diplomat, Josep Borrell, has admitted that not every member state agrees to…