In Kiev on the morning of Tuesday, may 30, began repair work on the Shevchenko Avenue, 27, where occurred the day before a massive break of a heating main.
It is known that the repair site of a heating system will last about a day.
It is noted that soon will be covered failure, which is formed as a result of breakthrough heating.
We will remind, on may 29, around 14:00, there is damage to the main pipeline with a diameter of 800 mm in the Goloseevsky Prospekt, 27, as a result of the hydraulic test.
Due to PE on the surface of the leaked water formed a gully on the local area with a size of 2×3 m
© 2017, paradox. All rights reserved.
A video documenting the destruction of a NATO-supplied tank in Ukrainian service appeared on Russian…
Russian President Vladimir Putin has officially been sworn into office for a fifth term. In…
Moscow will retaliate against British targets in Ukraine or elsewhere if Kiev uses UK-provided missiles…
Ukrainian President Vladimir Zelensky cannot enlist God in Kiev’s fight against Moscow, the Russian Orthodox…
Ukrainian President Vladimir Zelensky has proclaimed that God is an “ally” of Ukraine in the…
Israel is willing to pause its military offensive in Gaza if Hamas releases all the…