Tuesday , January 22 2019
Home / Incident / In the river because of the “mining” blocked the bridge

In the river because of the “mining” blocked the bridge

В Днепре из-за "минирования" перекрыли мостIn the river “mined” the Old bridge: traffic is completely blocked

October 26th, around 21:10, in the river off the Old bridge. According to preliminary data, the bridge was mined.

As reported by the patrol to the line “102” soobshil that the Old bridge was mined.

Because of this, the crews, police completely blocked off the bridge. Also stopped the movement of trams and trolleybuses.

If possible, Abiezrite Old bridge New and Kaydaksky. Unknown at this time how soon the bridge will open to traffic.

The place is called in the bomb squad. Pedestrians from the bridge, the police also evacuated.

© 2018, z-news.link. All rights reserved.

Check Also

In Krivoy Rog burning high-rise building, killing woman

The cause of the fire is established. January 18 at 4:11 in Service of rescue …

Leave a Reply

Your email address will not be published. Required fields are marked *