Categories: Video news

In Odessa will hold the reconstruction of the beach “the Seagull”. Video

The beach will build an overpass for walks and ride bikes.

Yesterday kicked off the online auction for the right to build new Bicycle and pedestrian overpass that will connect the health Route with the embankment on the 10th station of Big Fountain. Officials will choose a contractor that is implementing a project of 32 million UAH. How will the new object and what difficulties may arise during construction.

According to the tender documentation, the total area of the improvement will be more than 1000 square meters. Between 8th and 10th stations of the Big Fountain disassemble retaining wall of the slope and build the overpass on columns-pillars. At their base lay the tracks and the overpass will cover concrete paving slabs. Launch of operations scheduled for 11 September, but will it be possible to this date to find a contractor is unknown. “We have more than half of the tenders did not take place. We already depends nothing, all questions to the procurement system”, — said the responsible for the tender officer, municipal office road economy Gennady Delierium, adding that information on possible contractors will remain closed until the end of the auction to ensure fairness of selection.

Video rendering of the project, in advance published on the Internet channel of the city Council, the coast in the region of 10-th station has changed noticeably. However, the pedestrian overpass is not protected from the sun but in the shade under it — Park. On the beach level, apparently, will provide space for a few shops. However, the tender does not provide for the construction of the shopping complex, and green spaces promise to preserve. To complete the work plan by the end of 2018, so most likely next summer, patrons of the beach “the Seagull” will have to bypass the construction site.

Note that the Track of health and embankments on the Great Fountain also shared fenced area around the multi-storey family health center where there are finishing works. “Our complex was designed to be able to connect the Track of health. We work on the docking sections completed”, — told us the Director of the developer Andrey Medvedev.

Excactly the idea to extend the Track of health and to improve communication between the city beaches like, but the concern is the fate of villagestyle. So, social worker Svetlana Tan believes that because of increased construction on the coast with the onset of cold weather and a decrease in the number of pedestrians on the road may start to drive construction vehicles and private cars, although the fare here is prohibited. Worried some citizens and for the final result, he says, can get something like an updated Arcadia, which is liked by not everyone.

© 2017 – 2019, paradox. All rights reserved.

paradox

Share
Published by
paradox

Recent Posts

Palestinians chase away German diplomat (VIDEOS)

The German ambassador to the Palestinian Authority has been hounded by an angry mob and…

8 hours ago

White House mulls Russian uranium ban – Bloomberg

The Biden administration is considering a ban on enriched uranium from Russia using the president’s…

17 hours ago

Pro-Palestine protesters arrested at Texas university (VIDEOS)

State troopers used pepper spray and stun grenades as they arrested dozens of pro-Palestine protesters…

1 day ago

Ukraine running out of troops for US to train – WaPo

The number and frequency of Ukrainian soldiers receiving training in US bases in Western Europe has dropped…

1 day ago

Europeans won’t ‘go die for Donbass’ – Borrell

EU foreign policy chief Josep Borrell has insisted that member states don’t want their citizens…

2 days ago

‘No one’ willing to join Ukrainian army – soldier

Resistance to the continued military draft in Ukraine has taken some extreme forms, a soldier…

2 days ago