The facade of the building of the river port on Poshtova square plan to refurbish by may before the start of the Eurovision song contest.
As for the reconstruction of the building (monument), which was supposed to begin and end last year, end it for independence Day. “Now we coordinate design documentation with bodies of protection of monuments in Kiev. Plan to start stroyraboty in March,” — told us Andrey Vavrysh, the ideologist of the update port.
We will remind, the building was planned to open the restaurant the gallery with 15 restaurants, cafés, bars, beer restaurant with drinks of our own production, a grocery store, night and beach clubs on the roof of the building. The minimum amount needed to update the monument is $4 million.
By the way, had planned to transform not only the building of river port, but also the coastal area next to it. For festivals on the Dnieper river was proposed to set the stage, and placed on the sides of the fountains.
© 2017, paradox. All rights reserved.
The man who critically injured Slovak Prime Minister Robert Fico on Wednesday was a fierce…
The Asia-Pacific region should be free of military blocs because of their potential to undermine…
Russian President Vladimir Putin was welcomed with an honor guard after his plane touched down…
Russian President Vladimir Putin has set the stage for his state visit to China by…
С каждым днем онлайн-казино становятся все более популярными среди азартных игроков. И это вполне логично:…
Russian President Vladimir Putin has officially appointed Andrey Belousov as the new minister of defense.Belousov,…