Almost until the beginning of the new year holidays in Kiev, the movement from the Left Bank to the Right would be seriously complicated by: land South bridge repaired again. It is known that the repair work on this phase will start today and will run until December 20.
Relevant information is announced on the page on the social network Facebook “Kievavtodor.”
In road service bind partial overlapping of the bridge with the installation of a semi-rigid safety barrier in place where there is the Congress of South bridge in the direction of the Metropolitan highway. As a result, in the first row will set restrictive elements, because there will be service vehicles and equipment for repair works. It is known that from 12 November to this day acted the restriction of movement in the first row in connection with carrying out similar works.
South bridge in Kiev is one of “suffering” on the part of the repairs. Almost every summer, until September 1, overlap one of the bands to replace the road surface or road marking. Before the ban on movement of trucks, when the temperature exceeds the limit, new pavement for the summer season were dashed by heavy vehicles, which left potholes on the molten asphalt.
© 2017 – 2019, paradox. All rights reserved.
Ukrainian President Vladimir Zelensky has proclaimed that God is an “ally” of Ukraine in the…
Israel is willing to pause its military offensive in Gaza if Hamas releases all the…
The EU’s top diplomat, Josep Borrell, has admitted that not every member state agrees to…
Russia’s Defense Ministry has published a video clip from the front line with Ukraine showing…
Donald Trump is eyeing plans to push the NATO members to ramp up defense spending…
Former US President Donald Trump paid the $9,000 fine for violating a gag order imposed…