Categories: economy

In Borispol will build solar power capacity to 5 MW

The cost of the contract, which intends to enter into, Kyivoblenergo, is 7.28 million.

Kiev company Alyansehnergo order Kievoblenergo build a solar farm in Borispol power up to 5 MW.

The cost of the contract, which intends to enter into, Kyivoblenergo, is 7.28 million.

At the end of 2017 the Executive Committee of Boryspil city Council gave LLC Promin-Energy urban conditions and restrictions of building of zemuchastok in Boryspil for the construction of the SES capacity of 5mW.

At the end of 2018 Promin-Energy received in the national Commission, carrying out state regulation in spheres of power and utilities a license for production of electricity for the first stage of the SES capacity of 996,36 kW.

Earlier it was reported that in Odessa region began the construction of four solar power plants.

© 2019, paradox. All rights reserved.

paradox

Share
Published by
paradox

Recent Posts

Fico shooter protested suspension of Ukraine military aid – Slovak interior minister

The man who critically injured Slovak Prime Minister Robert Fico on Wednesday was a fierce…

2 days ago

No place for military blocs in Asia-Pacific – Putin

The Asia-Pacific region should be free of military blocs because of their potential to undermine…

2 days ago

WATCH Putin lands in Beijing for talks with Xi

Russian President Vladimir Putin was welcomed with an honor guard after his plane touched down…

3 days ago

Western elites want to prosper at the expense of others – Putin

Russian President Vladimir Putin has set the stage for his state visit to China by…

4 days ago

Зеркало сайта Vavada

С каждым днем онлайн-казино становятся все более популярными среди азартных игроков. И это вполне логично:…

4 days ago

Putin officially confirms new defense minister

Russian President Vladimir Putin has officially appointed Andrey Belousov as the new minister of defense.Belousov,…

4 days ago