Categories: Society

Between Odessa and the black sea promise to build a new bridge

Need for the construction of 132 million.

Old pontoon ferry across the Dry estuary, which is part of the route Odessa — the Black sea, is planning to replace the new bridge. The life of the structure comes to an end.

Preparation works began last year, but due to problems with financing the construction was suspended. Now, however, officials managed to partially solve the financial issue. According to the mayor of the Black sea Valery Hmelnyuk, the project supported the Cabinet. “On account of the city Council received 57 million UAH, intended to continue construction of the bridge,” said Hmelnyuk.

However, according to the estimates of officials, only need of 131.6 million. According to assistant Deputy mayor who oversees the building, Lydia Zaporozhchenko, in addition to the tranche from the state budget, another 13.4 million UAH allocated from the city Treasury, and 2.4 million went into the preparation of the documentation and of the project. Costs justify the poor condition of the crossing, because for the last couple of years, says Zaporozhchenko, to repair it was allocated about UAH 8 million.

“According to the documentation, after two years, ends its term of operation,” says Zaporozhchenko, adding that the overhaul of a ferry need about 40 million UAH. In addition, the pontoon is impossible to drive trucks weighing more than 20 t. “Close to the port, so this restriction is violated, that is unsafe,” he explained to us Zaporozhchenko.

Thus, the bridge needs to solve several problems at once. Now officials are counting on the support of the Odessa regional state administration and ready to get to work. Today in RSA will discuss the financing of the project. “The bridge was not built over the crossing, and next to it, so at the time of construction problems for the passage of vehicles will not be”, — assured us Zaporozhchenko.

MOVED THE OPENING

Meanwhile, the opening of the renovated another important overpass for the Odessa region — the bridge near the village of Palanca on the highway Odessa — Reni — postponed. “Issues have arisen during the performance of work — started to sink the ground”, — explained in the regional state administration and called the new deadline is 1 November.

© 2017 – 2019, paradox. All rights reserved.

paradox

Share
Published by
paradox

Recent Posts

Zelensky can’t ‘mobilize God’ – Russian church

Ukrainian President Vladimir Zelensky cannot enlist God in Kiev’s fight against Moscow, the Russian Orthodox…

7 hours ago

Ukrainians are God’s chosen people – Zelensky

Ukrainian President Vladimir Zelensky has proclaimed that God is an “ally” of Ukraine in the…

16 hours ago

Israel ready for temporary truce with Hamas – Netanyahu

Israel is willing to pause its military offensive in Gaza if Hamas releases all the…

1 day ago

Some EU states still consider Russia ‘good friend’ – Borrell

The EU’s top diplomat, Josep Borrell, has admitted that not every member state agrees to…

1 day ago

WATCH Russian forces destroy US-made armor

Russia’s Defense Ministry has published a video clip from the front line with Ukraine showing…

2 days ago

Trump considers pressuring NATO states to spend more on defense – media

Donald Trump is eyeing plans to push the NATO members to ramp up defense spending…

2 days ago